Saturday 19 May 2012

Windows, Doors and Bricks

Things are still moving along quite nicely up at the house, especially considering the bricks were only due to be delivered late this week. In reality the doors, windows and bricks were delivered on Monday with the first two being installed on Tuesday. Some of the garage wall was also started at the same time. As of yesterday they had a fair bit of the garage side of the house done which is good to see.

Looking at the 'buildsure' website today I noticed that the build is guranteed at a maximum of 20 weeks. So I guess while it could go under, we should hopefully be looking at being able to move in around the first week of September.

Bricks Delivered

Windows Delivered

 Bricks and windows looking out from the garage


Front windows installed

Home theatre room window


Alfresco stacker door

Alfresco sliding door and back dining window


Laundry back sliding door


One of the spare bedroom windows


Walk in pantry window


One of the spare bedroom windows


Garage wall being built


Garage side of the house


 View from alfresco looking towards kitchen and laundry