In the following days the roof was completed (about 2 days) and the bricks where acid washed. This was great as there was apparently a few drizzley days that would now not prevent work happening due to the roof being on. The Actron ducted A/C along with other electrical was also installed at this time along with the gyprock being delivered ready for the interior walls to be started. You can also see in a few of the pictures the electrical wires hanging out of the brick where some of our future lights will reside.